Jump Main Menu. Go directly to the main content

Projects

Start of main content

You are in:

  1. Projects

I-285/SR 400 Corridor Improvements, Atlanta, Georgia

Active Projects

TECHNICAL CHARACTERISTICS

Construction Start / End Dates

May 2016 – April 2020

Client

Georgia Department of Transportation

Construction Value

$ 460 M 

Contract type

Design-Build

The proposed improvements are designed to aid in reducing traffic congestion and improve safety in the area surrounding the I-285/SR 400 interchange in metro Atlanta.

New flyover ramps, new collector-distributor lanes and other facilities to aid east-west travel on along I-285 and north-south travel along SR 400 would be constructed.

TECHNICAL CHARACTERISTICS

Construction Start / End Dates

May 2016 – April 2020

Client

Georgia Department of Transportation

Construction Value

$ 460 M 

Contract type

Design-Build

The proposed improvements are designed to aid in reducing traffic congestion and improve safety in the area surrounding the I-285/SR 400 interchange in metro Atlanta.

New flyover ramps, new collector-distributor lanes and other facilities to aid east-west travel on along I-285 and north-south travel along SR 400 would be constructed.

Image Gallery

Video Gallery

Location

End of main content